fix formatting!
Slab: - rather than excavate, build up to highest point! - tamp after every foot of build up - after built up, clear gravel - inside this layer goes electrical lines, plumbing, main power & water Insulation: - cement board between the wood forms and the insulation - 8 inches insulation on all surfaces - under main slab = Roxul Comfortboard CIS (more durable than IS) - R47 in the walls - R95 in roof Vapor Barrier: - 10mm taped over the whole thing - How do I do a radon stack? - heat pumps? - wall insert air exchanger system